PLC Engineering Services and Operations Services work diligently behind the scenes to improve the power distribution system for our members.  In addition to expanding the system to provide power to new members, we also improve our system reliability by identifying locations where outages could be reduced by performing overhead system improvements, replacing aging existing underground cable or converting overhead lines to underground systems. 

Occasionally during this process, it may be necessary for a scheduled outage (a planned outage to allow for repairs or upgrades) to occur. In this case, we will make every effort to inform you in advance.

Current Undergrounding/Reliability Projects:

This is a list of the reliability projects that are in Engineering Design, Construction, or recently Completed. Civil work includes trenching, placing conduit (plastic pipe for protecting and pulling power cables) and vaults (underground concrete connection boxes), backfilling and restoration, and is performed by our contractor, Active Construction Inc. Electrical work includes installing power cables and transformers, removing power poles that are no longer used, and is performed by our Pen Light employees and our contractor Potelco. PLC OH to UG Conversion projects involve converting our overhead lines to underground. PLC Cable Replacement projects involve replacing aging underground cable (usually buried directly in the soil) with new cable in conduit.


Updated August 20, 2010.

General Project Area Project Type Project Status
Aqua Drive & Lakeview Way OH to UG Conversion In Design
Thomas Rd Phase 2 OH to UG Conversion In Design
Thomas Rd Phase 1 OH to UG Conversion In Design
24th Ave off Stone Dr OH to UG Conversion In Design
Rouse Rd OH to UG Conversion In Design
Wollochet Dr, 31st St to 50th Ave OH to UG Conversion In Design
Reid Dr & 14th Ave OH to UG Conversion In Design
South Moller Dr OH to UG Conversion In Design
South Vaughn Rd OH to UG Conversion In Design
3228 East Bay Dr OH to UG Conversion In Design
12th Ave FI OH to UG Conversion In Design
Crescent Beach Rd OH to UG Conversion In Construction
729 Fox Dr OH to UG Conversion In Construction
Fox Dr & 9th Ave OH to UG Conversion In Construction
Peacock Hill Ave, 144th St to 160th St OH to UG Conversion In Construction
Hunt St west of 46th Ave OH to UG Conversion In Construction
Danforth Rd OH to UG Conversion In Construction
11th Ave & Queets Dr OH to UG Conversion In Construction
34th St, Wollochet to 32nd St OH to UG Conversion In Construction
Gway, 10th & Hyak FI OH to UG Conversion In Construction
Stone Dr OH to UG Conversion In Construction
Jahn Ave OH to UG Conversion In Construction
Wollochet Dr, 40th St to Fillmore Dr OH to UG Conversion In Construction
82nd Ave South OH to UG Conversion In Construction
Vaughn Bridge Phase II OH to UG Conversion Completed
Island Blvd FI OH to UG Conversion Completed
North Hallstrom Dr OH to UG Conversion Completed
Picnic Point Dr OH to UG Conversion Completed
100th St KPN OH to UG Conversion Completed
126th Ave KPN, Minter Creek OH to UG Conversion Completed
Hallstrom Dr OH to UG Conversion Completed
Moller Dr south of Drummond OH to UG Conversion Completed
Slippery Hill Imp OH to UG Conversion Completed
Cromwell Beach Dr OH to UG Conversion Completed
82nd Ave & 71st St UG Cable Replacement In Design
Ford Dr UG Cable Replacement In Design
Fox Island Submarine Cable UG Cable Replacement In Design
7902 40th St UG Cable Replacement In Design
156th St KPN UG Cable Replacement In Construction
Erickson St UG Cable Replacement Completed
78th Ave UG Cable Replacement Completed
80th St KPS UG Cable Replacement Completed
Reid Dr & 29th St UG Cable Replacement Completed
Jackson Lake Rd - 186th Av  UG System Improvement In Design
Stone Dr, 24th Ave to Point Fosdick Dr UG System Improvement In Design
36th St/22nd Ave UG System Improvement In Construction
32nd Ave   UG System Improvement In Construction